The Bald River Falls Bridge in the Cherokee National Forest required replacement design. This bridge replacement will enhance stability for vehicle and pedestrian traffic through this heavily visited national park destination. TGS provided the engineering design services. The $2 million project was originally scheduled for completion in January 2023 but faced delays and was ultimately completed on May 30, 2025.
Services Provided:
- Estimates
- Hydraulic Design
- Load Rating
- Roadway Design
- Structure Design
- Surveys





