This project (U-6146) is located along US 29 / US 74 (Wilkinson Blvd.) in Cramerton, NC and will consist of realigning the roadway to the north to accommodate the bridge widening over South Fork Catawba River. The new bridge will be a five-span 450’ long bridge with approximately 8,500 linear feet of roadway improvements including sidewalks and bicycle lanes. Construction is slated to begin in 2026.
Services Provided:
- NEPA/SEPA Compliance
- Hydraulic Design
- Permitting
- Public Involvement
- Roadway Design
- Structure Design
- Traffic Control
- Utility Design & Coordination





