Bridge over Tar River

This project (B-4786) involved replacing Pitt County Bridge No. 38 on US 13 (Memorial Drive) over the Tar River in Greenville. The new structure will be an eight-span concrete girder bridge, approximately 550 feet long, featuring two 12-foot lanes. The project was let in August 2022 and has an anticipated completion date of Spring 2026.

Services Provided:

  • Categorical Exclusion
  • Erosion Control
  • Hydraulic Design
  • Pavement Marking
  • Permitting
  • Roadway Design
  • Structure Design
  • Utility Design
  • Work Zone Traffic Control
Scroll to Top