This project involves a design-build replacement of Bridge #13, located on Howard Gap Road over the North Pacolet River in Polk County.
The bridge was closed after a storm caused the collapse due to flooding in the summer of 2023. The design tasks were completed in July 2024 and construction is slated to be completed by the summer of 2025.
Services Provided:
- Erosion Control
- Hydraulic Design
- Pavement Marking
- Roadway Design
- Signing Plans
- Structure Design
- Utility Coordination
- Work Zone Traffic Control





