Biltmore Bridge

TGS was selected by Biltmore Farms to design a structure for a new French Broad River crossing intended to provide access to the Project Ranger Industrial site. The 5-lane bridge connects NC 191 (Brevard Road) to a portion of the Biltmore Farms property. The project includes a multi-use path over the river approximately 1,000 feet downstream of the Blue Ridge Parkway crossing. The design also involved intersection improvements and widening of NC 191. Construction for this $18M project was completed in 2022.

Services Provided:

  • Contract Administration
  • Erosion Control
  • FEMA Compliance / Permitting
  • Hydraulic Design
  • Roadway Design
  • Structure Design
  • Surveys
Scroll to Top