Express Design-Build Bridges

Client: NCDOT

TGS has been providing engineering design services through construction engineering and inspection on Design-Build Bridge Replacement projects since 2011. Over the last fourteen (14) years, our teams have performed on 115 projects across North Carolina. Several have been emergency express design-build replacements.

Most recently, the team was selected to design eleven (11) structures to be replaced due to damage caused by Hurricane Helene in Western North Carolina in September 2024.

Services Provided:

  • Construction Engineering & Inspection
  • Erosion Control
  • Hydraulic Design
  • Permitting
  • Roadway Design
  • Structure Design
  • Surveys
  • Utility Design
Scroll to Top