Projects

A full-service engineering firm with multiple offices across the state, TGS has the capability to handle your project from start to finish. We offer a complete range of design and construction-related services including planning, surveying, site investigations, soil and foundation recommendations, rail engineering and coordination, drafting, inspection, contract preparation and administration, and construction supervision. Our expertise along with our previous projects benefit our clients through collaboration and efficient designs.

  • The Reserve at Stonegate Apartments

    The Reserve at Stonegate Apartments

    TGS provided turn-key site planning and design services for this planned 60-unit complex in Boiling Springs, North Carolina. Designed to…

  • Nelson to Clegg Siding/Hopson Road Grade Separation

    Nelson to Clegg Siding/Hopson Road Grade

    This NCDOT project (TIP U-4716A/C) involved 3.8 miles of grading, drainage, and trackbed for a new mainline and siding track…

  • Design-Build Bridge Replacements

    Design-Build Bridge Replacements

    As part of a $6.2M Design-Build contract for NCDOT in Division 12 (17BP.12.R.101), TGS provided field inspection services for the…

  • Carolinas Healthcare System

    Carolinas Healthcare System

    This medical office building located in Kings Mountain, North Carolina is home to Kings Mountain Internal Medicine, Cleveland Endocrinology and…

  • Magnolia Plantation

    Magnolia Plantation

    This mixed-use development is situated on 69 acres in Shelby, North Carolina. TGS provided turn-key site planning and design, including…

  • UNC Greensboro Pedestrian Tunnel

    UNC Greensboro Pedestrian Tunnel

    A pedestrian tunnel under a Norfolk Southern rail line, this structure was a joint project between UNCG and NCRR. Designed…

  • Upper Twin RR Bridge

    Upper Twin RR Bridge

    In order to replace an aging 1908 historic pin truss bridge with a modern plate girder structure over the French…

  • Western Wake Expressway

    Western Wake Expressway

    As part of the third phase of the first toll road in North Carolina, the Triangle Expressway, TGS provided design…

  • Peach Street Improvement

    Peach Street Improvement

    This project will improve traffic operations and safety for the area residents in Shelby, North Carolina. Improvements include the realignment…