Howard Gap Road Improvements

This $18M project included the widening of 7 miles of a local collector in a rural area of Henderson County, North Carolina from Jackson Road in Fletcher to just south of US 64. TGS provided turn-key surveys and design services that included widening two 12’ lanes with paved shoulders, the addition of bike lanes for safety of cyclists, adding turn lanes at several intersections, a roundabout intersection, four bridge replacements, and retaining walls.

Services Provided:

  • Surveys
  • Planning Documents
  • Roadway Design
  • Structure Design
  • Hydraulic Design